Home » Latest News » PM Modi to lay foundation for two major hydropower projects in Arunachal tomorrow

PM Modi to lay foundation for two major hydropower projects in Arunachal tomorrow

Itanagar, Sep 21 (IANS) Prime Minister Narendra Modi will visit Arunachal Pradesh on Monday to lay the foundation stones of 13 development projects including two major hydro power projects, worth over Rs 5,127 crore at Itanagar and will address a mega public meeting at the Indira Gandhi Park here, officials said on Sunday.

A senior official said that the Prime Minister will virtually lay the foundation stone of two major hydro power projects with a total generation capacity of 426 MW and both the projects would be commissioned by the state owned North Eastern Electric Power Corporation (NEEPCO).

The projects include the Heo Hydro Electric Project (240 MW) and the Tato-I Hydro Electric Project (186 MW) of NEEPCO, which is a wholly owned subsidiary of National Thermal Power Corporation (NTPC) Limited.

According to the official, these two power projects having estimated cost of over Rs 3,700 crore, are being developed by NEEPCO in joint venture with the government of Arunachal Pradesh.

The Heo Hydro Electric Project (3×80 MW), located in the Siyom sub-basin of Shi Yomi district, will generate about 1000 MUs annually. The Tato-I Hydro Electric Project (3×62 MW) will generate about 803 MUs annually.

Both projects are expected to harness the vast hydroelectric potential of Arunachal Pradesh and promote sustainable energy generation, thereby bringing substantial socio-economic benefits in the region, the official said.

He said that by fostering new employment opportunities, these initiatives are poised to propel the state along a path of growth and progress, fueling development and building a brighter future for its citizens.

Together, the Heo and Tato-I projects will significantly contribute to India’s clean energy targets, while also transforming the energy and development landscape of Arunachal Pradesh thereby improving the power sector across the country with the aim to create ‘Viksit Bhart by 2047’, the official pointed out.

The North Eastern Electric Power Corporation (NEEPCO) has been the backbone of power generation in India’s Northeast region since its inception in 1976. With a vision to harness the region’s immense hydro potential, NEEPCO has evolved into a Mini Ratna Category-I Public Sector Enterprise.

Since 2020, NEEPCO is a subsidiary of NTPC Limited and boasts an installed capacity of 2,057 MW, generated through a diversified portfolio of hydro, gas based and solar projects. The NTPC Limited is India’s largest integrated power utility, contributing one-fourth of India’s power requirements and has an installed capacity of 83 GW, with an additional capacity of 30.90 GW under construction, including 13.3 GW of renewable energy capacity.

The company is committed to achieving 60 GW of renewable energy capacity by 2032, strengthening India’s Net Zero goals, the official stated.

–IANS

sc/pgh

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by BhaskarLive.in and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of BhaskarLive.in We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, BhaskarLive.in takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Post